These diagrams support the installation of MVEC’s various residential Energy Wise Programs.
- PSWH at Service Entrance
- PSAC at Disconnect
- Single Off Peak Load
- Single Off Peak Loads with Dual Socket
- Single Heat Off Peak Load (Heat Pump)
- Water Heater and Two Heating Off Peak Loads
- Multi Energy Wise Loads
- 12 VDC Relay
- Water Heater and One Heat Load
- Water Heater and Two Heat Loads with CT
- Water Heater and Multiple Off Peak Loads
Diagrams are for general purposes only and are not intended to serve as a set of specifications for the installation of equipment. MVEC is not responsible for installations of equipment which it has not specifically approved. All wiring must be completed by the owner or an electrician and must be inspected by a local or state electrical inspector before MVEC can make an appointment to install the meter. Please contact MVEC or your electrical contractor for further information.
All Energy Wise Diagrams
Includes information on Energy Wise controllable loads, equipment list and installation specifications, as well as all diagrams listed above.
For more information call
952.492.8330
info@www.mvec.net


